| Required capacity |
Determines generator count, turbine class, redundancy, and staged capacity options. |
2 MW, 10 MW N+1, 50 MW phased, 250 MW+ program. |
| Voltage and frequency |
Confirms electrical compatibility, transformer needs, and regional fit. |
480 V, 13.8 kV, 50 Hz, 60 Hz, three-phase. |
| Fuel preference |
Shapes runtime, logistics, emissions review, and operating cost. |
Diesel, natural gas, dual fuel, turbine fuel, open to options. |
| Application |
Duty cycle affects equipment selection, package design, and service planning. |
Standby, prime, continuous, bridge power, grid support, emergency. |
| Site constraints |
Access, noise, emissions, pad space, and interconnection can drive configuration. |
Urban site, remote mine, utility yard, data center campus, export location. |
| Schedule |
Availability, transport, inspection, commissioning, and phased delivery all depend on timing. |
Immediate, 30 days, staged delivery, commissioning deadline. |