| When should a project consider bridge power? |
Bridge power may fit when permanent utility service, interconnection, or plant infrastructure will not be ready before operations need usable power. |
Required MW, start date, expected bridge duration, load profile, site access, voltage, frequency, and fuel availability. |
| What matters for data center power? |
Data center projects usually need early review of redundancy, switchgear, fuel strategy, commissioning schedule, emissions, and phased capacity. |
IT load, N/N+1 target, voltage, expansion schedule, standby or prime use, fuel plan, and utility timeline. |
| When do mobile turbines make sense? |
Mobile turbines can fit large fast-track power needs, utility support, contingency capacity, and projects where rapid deployment is more important than a permanent plant design. |
Megawatt block size, fuel availability, site conditions, interconnection method, duration, and logistics constraints. |
| What makes a packaged power plant different? |
A packaged power plant combines generation equipment with practical support systems such as controls, switchgear, fuel systems, enclosures, transformers, and balance-of-plant planning. |
Plant size, generator or turbine preference, controls strategy, fuel infrastructure, emissions limits, transformer needs, and delivery schedule. |